Commercial Systems

Why Should You Use MIT To Build your Aquaphonics System?

It took 4 people more than 4 months to build our 900m2 unit in Thailand using liner DWC. The MIT would have cut this time down to 10 days. Three years after, we started to face major leaking issues.

Is your labor cost high? How much does 4 months of labor cost? Do you want start producing just a few days after starting construction?

Do you want to be able to reconfigure your system easily at will? Are you renting the area? Is there a risk you would have to relocate? Is there a weight limitation of the building structure hosting the unit? Are you looking for a system optimized for maximum growth rate?

Our Projects

Commercial Aquaponics Unit in a hotel in Singapore

Watch this 8-minute video to see the three phases of the project. From Design, Installation, Training, Coaching that is still ongoing, and some feedback from the Hotel Manager and Chefs. 
This Urban farm located on the 5th floor of th eFairmont Hotel in Singapore feeds all the restaurants in Fairmont and Swissotel The Stamford.   

AHAS Farm in Kuala Lumpur

The AHAS Gombak farm is where we run our production tests and produce daily some great food for our selected Customers in Kuala Lumpur. Our farm is the host of all new features and equipment we are testing before bringing them to you.

Need Design Help?

Do you need our assistance with the hydraulics design?

Just let us know:
– The project google map location
– Your targeted area specifications and dimensions
– The average water temperature of a nearby pond or pool
– Your production mix and targets

The preliminary design is free
The complete design with hydraulics and production performance estimation varies from $995 to $2,950 totally refunded against equipment purchase

Here are some designed the AHAS team has been preparing for upcoming projects 

Solutions for Commercial Use Cases

Hotels & Resorts

Are you looking at differentiating your facilities from competitors in order to attract more guests?

Would you like to offer your Guests guaranteed healthy food?

Would you like to offer your Resort Guests some Aquaponics learning activity and Aquaponics related Seminars?

Or are you simply willing to promote your carbon footprint reduction?

Hospitals

Aquaponics curly kale contains a huge amount of antioxidants and could be grown on your rooftop for the benefit of your patients. Among many other healthy vegetable and fish. Jade Perch are rich in Omega3 and easy to grow aquaponically.

Commercial Unit Procurement Timeline

Phase 1: Project definition
We exchange information on the project: production objectives, climate, land size and configuration (orientation, slope, access to water and power, …). A site visit can be completed if required.
We agree on the project objectives and responsibilities.
AHAS provide a draft cost estimate and related refundable design fee

AHAS can assist you building your project. We operate on a 6-phase process:

Phase 2: AHAponics Unit architecture design
Upon payment of the refundable design fee, AHAS delivers a detailed design with layout drawings, hydraulic design, expected production rates, equipment, commissioning, and training & coaching costs.

Phase 3: Equipment order
The design is discussed, revised if necessary, and approved. AHAS invoices 50% of the equipment cost and prepare the equipment.

Phase 4: Equipment delivering and installation
The equipment balanced payment is received. The equipment is shipped to the requested site. The installation begins.
Option 1: local supervision is required and AHAS mobilizes a team to complete or assist with the the unit installation. This involves mobilization fee, day rate for AHAponics Architect, AHAponics unit construction engineer, or AHAponics unit startup and plant expert. 
Option 2: We train your operating team in our AHAS Farm facilities in Kuala Lumpur and provide remote support during your installation

Phase 5: Commissioning and unit startup, if required
AHAS starts the AHAponics unit, complete the unit commissioning. The installation, commissioning, and training & coaching  payment is completed. The local operators training is delivered and several sessions of coaching, generally spread over 3 months, are delivered.

Phase 6: Long term support
AHAS provides free remote and consulting on-site technical support as required. 

Under normal conditions, the equipment can be shipped within maximum 8 weeks of reception of down payment.
You benefit from all the knowledge we have acquired over our years of experience, from seeding to harvesting.